Sunday, October 31, 2010

Day 34 - October 31st (Day 17 of 65)

Took the wife over to see the completed work today. We are both pleased by the progress thus far, and hope it continues. Of course there was nothing done today, so we stood back and enjoyed the view :->.



What's the forecast say for next week?

Brisbane Forecast
Issued at 4:15 pm EST on Sunday 31 October 2010

Warning Summary
Nil.

Forecast for Sunday Evening
Fine. Light E to NE winds.

Precis:       Fine                               

Forecast for Monday
Mostly fine. Chance of a shower in the evening. Light winds and a NE sea breeze.

Precis:       Mostly fine.                       
City:         Min 17    Max 27
Bayside:      Min 16    Max 26
UV Alert:     7:30 am to 3:40 pm, UV Index predicted to reach 14 [Extreme]

Tuesday       Early shower then fine                 Min 17    Max 28
Wednesday     Fine                                   Min 17    Max 27
Thursday      Showers increasing                     Min 18    Max 23
Friday        Showers                                Min 18    Max 22
Saturday      A shower or two                        Min 17    Max 24
Sunday        A shower or two                        Min 16    Max 25



And the rainfall forecast?



Saturday, October 30, 2010

Day 33 - October 30th (Day 16 of 65)

Weekend today, so there was nobody onsite today. I have been updating the calendar along the way so you can see the progress being made.

If you are using GMail, twitter, or Yahoo, you can add yourself as a follower of this blog here.

Got some extra photos of the building after having a good look at it all.

This is the ventilation pipe that comes off the drain connected to the island bench. This is coming off the pipe that was added to the wrong location. 

--
This is the shower near the child's retreat.

--
This is how they have moved the pipes.

--

--

--

-- 
Below is how you can tell that they broke through to the foam underlay...A piece of it sitting in the corner.

--
This is part of the gas piping that runs through the ceiling space.

--
This is the air conditioning unit in the roof space. I'm presently a bit concerned how the trusses are only just sitting on the two of three steel frames. If you notice some other builds (e.g. here from this blog) you can see the units sitting over four trusses with some overhang on the edge. The site supervisor is looking into this for me.

--
The other side of the air con unit it the roof.

--
Below is the piping which goes outside the house. One is going into the gutter and the other is going beneath the gutter (see next image).

--

--
This is the piping showing on the outside of the roof.
--
The view now from the front of the house to the rear.

--
The three windows at the front of the house.

--
Here you can see the side bedroom with the high window.

-- 
A view into the house from one of the windows. 

--
This is where I presume the error for the pipe work above came from. They have measured from the edge of  bedroom three instead of bedroom 2.

--
The roof space above the bedrooms.

--
A close up.

--
The same space above the garage.




Looks like some wet weather might be on its way?? Fingers crossed it holds off until the afternoons.

Brisbane Forecast
Issued at 11:10 am EST on Saturday 30 October 2010

Warning Summary
Nil.

Forecast for Saturday
Fine. Light to moderate NE winds.                                

Precis:       Fine                               
City:         Max 26
Bayside:      Max 25
UV Alert:     7:30 am to 3:40 pm, UV Index predicted to reach 14 [Extreme]

Forecast for Sunday
Fine. Light to moderate NE winds.                               

Precis:       Fine                               
City:         Min 17    Max 27
Bayside:      Min 17    Max 25

Monday        Late shower                            Min 17    Max 27
Tuesday       Showers, thunderstorm                  Min 16    Max 27
Wednesday     Shower or two                          Min 16    Max 25
Thursday      Shower or two                          Min 17    Max 24
Friday        Showers                                Min 18    Max 23
The rainfall forecast...


Friday, October 29, 2010

Day 32 - October 29th

Spoke with our site supervisor twice today.  The first time he phoned we spoke about the wall mounted hot water system (gas) that was being added. He noted that the unit had been shown on the plans to be mounted on the exterior wall in between the Living room and Family room. He said that whist the plumbers can do this, the hot water would take longer to reach its destination, and so they recommended that we move it in between Bedroom 4 and the Child's Retreat. He said that the modification would not cost anything. I have given him the go ahead.

On the second phone call we spoke about the issue in the robe of Bedroom 4, where the piping had been added in the wrong location. He said that while he initially had thought that they would not break the termite barrier, this proved to be impossible to do as the large air vent pipe had to be dug down a little way past the barrier in order to add an angle to turn before hitting the top of the concrete. They have now moved the piping, but will need to reinstate the termite barrier before it is re concreted again.

Beside the plumbing going in, they also added the air conditioning unit inside the building, as well as most of its ducting. One thing that does concern me is the way that the main unit in the roof cavity is mounted. It seems to me at least that any slight movement, and the unit could come through the roof cavity? I will point this out to the site supervisor.

The site supervisor also said that the bricks will be turning up next week as well as the windows!

Here are the pictures for today. Click on the image for a larger view.

--
Where the water comes from the street. The plumber didn't want anyone to use the taps as he was testing the pipework, so he added a message on the wall  ;->

--
The water pipes running down the side of the building.

--
This is where the hot water system will go.

--

--
This is the piping for the air conditioner.  Looks like we need to fix up the yellow down pipe ?

--
This pipework will connect to the water tank. I found out from the plumber that I met onsite this evening, that the toilets use the water from the rainwater tank by default, and then if it runs out the buoy inside the tank will switch the water source to the mains supplied. The water tank will connect off one of the arms of the copper pipe.

--
One of the corners of the home. Each corner is connected to the rainwater tank.

--
The piping off the garage. The pipe at the back looks like it may be connected to the gas tanks as this is where they will be situated.

--
This is in the children's bathroom and will service the bath.

--
These pipes are also in the bathroom and will service the sink.

--
This device is currently testing the water pressure to ensure that there are no leaks (??)

--

This is where we were a little concerned about the pipework. The site supervisor agrees with me and will be getting the termite barrier reinstated, hence the concrete is waiting for this to occur. The plumber who I met onsite this afternoon said he suspects they measured wrongly from the front of the house? Ah well! Mistakes will be made. As long as it's fixed correctly.

--
The piping above goes over to the island bench located in the kitchen, which is pictured below.  Lovely red soil!!

--
This pipe goes to the stove and oven in the kitchen and will be connected to the gas bottles near the garage.

--
These pipes are in the laundry and will service both the sink and the washing machine. We got them added underneath a bench that is going here to try to hide the piping as much as possible.

--
The floor drainage has been cut to ground level.

--
These pipes are for the sinks located in the Ensuite.

--
Looks like they still need to cut the large pipe in the floor?

--
This is the pipework located inside the shower in the Ensuite.

--
The piping going to the toilet in the Ensuite.

--
This is the intake for the air conditioner located near the broom closet.

--
This is the main unit located in the ceiling cavity. I'm not to sure about how it is mounted as the timber is only "just" touching two of the beams.

--
This is where the air is split off into the different rooms. It has a control on the top of it to adjust where the air is going.

--
This piping goes into the Rumpus room.

--
This is the piping going into the master bedroom.

--

--
This is in the Living room (aka study)

--
The children's study.

--
Bedroom 3

--
Looking into Bedroom 2


The weather is looking good again for next week. 

Brisbane Forecast
Issued at 4:15 pm EST on Friday 29 October 2010

Warning Summary
Nil.

Forecast for Friday Evening
Fine. Light to moderate SE to NE winds.

Precis:       Fine         

Forecast for Saturday
Fine. Light winds, tending moderate E to NE in the afternoon.                   
           

Precis:       Fine                               
City:         Min 17    Max 27
Bayside:      Min 17    Max 25
UV Alert:     7:30 am to 3:30 pm, UV Index predicted to reach 13 [Extreme]

Sunday        Fine                                   Min 17    Max 27
Monday        A few showers, late storm              Min 17    Max 27
Tuesday       Becoming fine                          Min 17    Max 27
Wednesday     Fine                                   Min 16    Max 27
Thursday      Possible shower                        Min 17    Max 25
Friday        A few showers                          Min 18    Max 23

The next routine forecast will be issued at 4:50 am EST Saturday.


And the rainfall is looking promising...