The front door has been installed.....
--
From the inside....
--
Bedroom one's windows have been installed.
--
Bedroom two's windows on the side of the house have gone in as well.
--
The bricks have arrived. This shows the three colours which will be blended to make it look like this.
--
The sand for the mortar has arrived.
--
The side windows have gone in now as well.
--
And the rear windows..
--
The sliding door into the master bedroom has been added.
--
The "bar style" windows haven't arrived just yet.
--
All the bricks have been laid out around this side of the property. They still need to do the other side..
--
The power box has now been mounted onto the wall.
--
--
All the windows and the laundry door have been added.
--
From within the garage the rear door has been added.
--
This is the frame for the door as well as the study window.
--
The bathroom windows are opaque.
--
A view out from bedroom one,
--
The winding mechanism for these windows.
--
The inside of Bedroom two.
--
The bath. The frame has now been added as well.
--
The electrical and data cables in position.
--
They have now run the electrical cable over to the middle of the floor for the kitchen appliances.
--
This will be the two beams from the front of the house. The metal posts will be mounted into the brickwork and the timber will show.
--
From within the study, the door frames have now been added. these will have sliding doors on them to allow them to be hidden away when you don't want to see them.
--
The kitchen. This image shows the AC power cable coming through the concrete and on the wall the location for the air vent to be bolted to (this will go above the stove).
--
The Laundry door.
--
The master bedroom windows.
--
A view into the Ensuite and storage cupboard.
--
This is in the kitchen and is where the phone point will be added.
--
The cabling for the TV unit.
--
The four box windows in the Rumpus.
--
A view outside from the rumpus.
--
A view from the outdoor room looking at where the outdoor fan will be mounted.
--
The three coloured bricks we will have mixed and added around the house.
This is the light coloured bricks.
--
These are the orange coloured bricks.
--
These are the red coloured bricks
--
This is a shot from inside the garage showing where the garage door opener will be mounted both centrally and also its arms on the sides.
--
A wide shot of the side of the house
--
A wide shot of the other side of the house.
--
A view from the front of the house.
Forecast for tomorrow looks good, if today was anything to go by. But it looks wet for the rest of the week perhaps?
Brisbane Forecast Issued at 4:15 pm EST on Tuesday 2 November 2010 Warning Summary Nil. Forecast for Tuesday Evening Fine. Mostly light W to SW winds. Precis: Fine Forecast for Wednesday Mostly fine, possible shower. Light to moderate SE to NE winds. Precis: Mostly fine, possible shower City: Min 16 Max 26 Bayside: Min 15 Max 25 UV Alert: 7:30 am to 3:40 pm, UV Index predicted to reach 14 [Extreme] Thursday A few showers Min 18 Max 24 Friday A few showers Min 18 Max 23 Saturday A shower or two Min 17 Max 23 Sunday A shower or two Min 17 Max 26 Monday A shower or two Min 18 Max 26 Tuesday Mostly fine, possible shower Min 18 Max 27 The next routine forecast will be issued at 4:50 am EST Wednesday.
No comments:
Post a Comment
Please add your comments below. I'd love to hear from you!!