Day 87 - December 23rd (Day 34 of 65)

Well it looks like the electricians mad a start yesterday. The site supervisor said they weren't going to be starting until around the 7th of January? The only problem now is that they have already added a point in the entertainment unit cupboard that was supposed to be moved elsewhere? Will have to let our Site supervisor know.

--
Garage. Ceiling power supply added as well as some of the wall outlets.

--
Children's study

-
Bedroom 4. Doors have been re added.

--
Other wall of the children's study

--
The children's shower screen has been added.

--

--
Power switch in the children's bathroom. It's a bit hard to see here, but they have cracked the paintwork :-<

--
Bedroom 3 cupboards

--
Bedroom 2 wall outlets.

--
Study

--
Diito

--
Power to the fridge...

--
And now on the splashback

--
At both ends
--
The Dining room

--
The rumpus

--
Ditto

--
The Laundry

-- 
The master bedroom. Wall switches now installed.

--
The ensuite

--

--
Data and Antennea... On the wrong shelf They should be one shelf up.

--
Ready to be added...Need to let them know not to add them here

--

--