Stopped by early this morning and was given a tour of the house. I noticed that the home network package has been added and all of the data points have been placed throughout the home.

The site supervisor told me that the electrical is booked in for the 10th as well as the flooring. Not sure how they will  work together? The painters were due to finish today, but from the looks of things, they still have a couple of areas to do above the doorways. They have given all the doors a second coat of gloss paint which has really bought the colour out in them.

The guttering has been installed by a company called Stoddart. Apparently one of the managers of this company lives close by. I pointed out some areas on the guttering that need fixing (I'm sure he knows, but just in case anyway :->).

He also mentioned that before handover they grade the soil on the property, away from the house. We noted that on the high side of the house the water has been lapping against the side of the home during the downpours we've been having.

Found out that the shower screen in the childrens bathroom hasn't been installed just yet, as the base they sent us was bent. We are awaiting the delivery of a new one...
--
Outside the house today. Probably the last day of sunshine we are going to get if the weather forecast is to be believed?

--
Looking into the kitchen today.

--
Looking into the bathroom. Got a shot this afternoon as well and they have taken down the plastic curtain....

--
Home network package without cover

--
Home network package with cover.

--
Garage roof.

--
Spot the dot.

--
Again

--
Bedroom 2. Data has been connected.

--
Glossy doorways in Bedroom 2

--
Power cable haging from the roof in Bedroom 3

--
Power cable hanging from the roof in the children's study

--
Bedroom 4

--
Hallway to the rear of the house. Study on the right.

--
Data in the Study.

--
They removed the cover today. An issue they have with the center unit is that the cables were meant to go at the very bottom of the cupboard. The problem is that the draws are here and there won't be any room to add power cables up. They are going to move it from the bottom draw up to the second shelf now instead.

--
In the rumpus room

--
Ditto

--
Looking towards the living room

--
Data in the dining room..casue you never know when you might need a byte... :->

--
Kitchen tonight

--

--
The master bedroom cupboards

--
The ensuite

--
Ditto

--
The garage from the other side.

--
The doorway.





1 comment: