Thursday, December 9, 2010

Day 73 - December 9th (Day 27 of 65)

There was no one onsite today as was indicated to me by the painter yesterday. The weather was great for a change!  I took some photos of the stained doors today. I think they still have another coat to go on as well as some varnish.

The box in the garage revealed the kitchen sink and plumbing items. I have also taken photos of bedroom 3 where the wall has been repaired and the garage, where the wall was repaired as well. The splashback area has a sign on it also (this was here yesterday).

I have a shot of the granite benchtop as well. Looks good (sorry about the smudge mark in the top left of all the shots...I forgot to clean the lens!!)

--
Outside of the house

--
The stained front door.

--
The stained bifold doors

--
The stained bifold windows.

--
Everything in the garage except for the... Nope..that's hear as well.

--
The repaired wall in the garage.

--
The repaired wall in Bedroom 3

--
The area under the bathroom sink.

--
Plaster added to the cornice.

--
Glass splashback area.

--
Looking out from the pantry

--
The other side of the bilfold doors.

--
Other side of the bifold windows.

--
The granite top of the kitchen bench.

--
The door hinges

-- 
The paint

--
The Laundry sink

--
The master bedroom Ensuite

--
Looking out from the master bedroom walk in robe

--
The family room

--
A bit of dust on the cabinet.

--
Ditto

--
The items to mount the sink into the bench with.


2 comments:

  1. By my judgement you should be fitted out before the Christmas break. Then you should be in at about February.