They also sprayed the top of the doors where they were in the way when doing the roof... I managed to get a shot of the kitchen bench today as well. Looks good.
--
Downpipes added.
--
--
--
The sink!
--
A little bit of overspray...
--
Ditto on the doors...
--
--
--
--
The kitchen
--
Very nice!! The kitchen bench!
--
hmmm... Well at least the wall has been fixed...
--
--
They'll clean up the over spray on the tiles with thinners or some sort of cleaner.
ReplyDeleteOnce the painting is done, it'll move so fast. Almost everyday is a different thing happening. You're just about due for your water tank soon. Who's connecting it in? I met the Metricon plumber on site and asked if he could do it, plus I paid him cash-in-hand. He was happy to do it. You might get the same plumber as I did. He lives in R-Bay. Very convenient
You check that all the down pipes don't line up with a tap like mine did?
I actually bought the tank and its installation from Bluescope steel. I have given our site supervisor their details, so he can let them know when to install it.
ReplyDeleteIt's the same place the tank was going to come from anyway.
I think they need the Electrical installed first however as the tank runs on an AC pump likes yours..?