Select an option:

Tuesday, December 14, 2010

Day 78 - December 14th

Well the builders were back onsite today. They have started to paint all the doorways. The bath for the children's bathroom also arrived today.

I note that the builders left two of the windows wide open today as well. I shut both of them.

--
The bath

--

--
The bathroom ..  window left open...?

--
Bedroom 4. Window left open.

--
I note the screws have been removed from the window openers. They must do this so they can paint around it  easier...

--

-- 
Hallway

--
Study with paint cans!

--
Living room with paint cans.
It looks like they have done the final coat on this area?

--
Laundry doorway has been done.

--
Same with the "broom" closet

--
Water closet doorway in the ensuite has been painted.

--
The Kitchen

--
Ditto

--
I noticed that the small fence that the neighbours put up to stop the builders from driving onto their property has come down some time over the past 24 hours.

--
I thought the builders might have done it until I saw this power box on the other side...

--
And some tyre tracks up the hill (Yes..they are faint)

-- 
and some burnouts in the grass.....

--


4 comments:

  1. Luckily for you, they didn't hoon around on your side of the street. Are you the first to build in your street? Doesn't look like there's any houses around

    ReplyDelete
  2. No..We are the second to build in our street. there is a third now underway as well.

    ReplyDelete
  3. Those painters opened the windows as we've been having quite humid and hotter weather lately.

    ReplyDelete
  4. yes. I don't mind that. It'd be nice if they closed them though... with the weather being so unpredictable, rain could get in and ruin the paint work...

    ReplyDelete

Please add your comments below. I'd love to hear from you!!