Anyway, without further ado....
--
Sand has been taken away.
--
Driveway has had concrete removed.
--
The rubbish cage has been removed
--
--
--
Soil has been leveled. Still need to remove the orange pipe....
--
--
--
--
--
--
Might need this pipe leveled..it's on a bit of an angle....
--
Need cover for this drain.
Wow, looks good once they do that. Ours should have been done today, off for a look tonight!
ReplyDelete