Monday, January 10, 2011

Day 105 - January 10th

Well the electricians turned up today and pretty much wired the entire building!


We chose the LED lights for most of the home. They were much brighter than the standard light and switched on much quicker. They installed  the lights in the kitchen, dining room, in the entertainment unit, and the two outside lights we had asked for. The ventilation  fans were also installed in the bathrooms  The outdoor room had four lights added as well as a fan, and the fluro lights were added to the garage.

Not far to go now. Tiles, air conditioner, painting the eves (almost done) fixing the errors around the site,  and then moving the soil around the outside of the home, and finally the stove and canopy.

--
Light near the front door

--
Two lights in the children's study

--
Light in the spare bedroom

--
Light and smoke alarm in the space between all the rooms

--
Light and vent in the children's bathroom

--
Lights in the kitchen and dining room at the back of the image

--
Light's and vents in the Ensuite

--
Lights in the master bedoroom

--
Fan and lights in the outside room

--
Lights in the living room

--
Light in the cutout.

--
A little hard to see here, but there is an outside light near the sliding door, which faces two ways.

--
Switch added for the air conditioner

--
Vents added to the eves

--
Light in the portico

--
Lights outside the garage

--
Lights in the garage

--
Light in the panty

--

--
Lights beneath each wall cabinet.

--
Lights on the other side of the house

--
Outdoor room again

--
Vents

2 comments:

  1. Have you got plumbing completed yet? Toilet's and taps installed?

    ReplyDelete
  2. Hi Jay,

    Yes. Almost complete. Just some pipes under the sinks to be connected.

    p.s. hope your wife is well. Good luck with everything!

    ReplyDelete